Knowledge Gap and the Balance between Explicit and Tacit Knowledge in Cross-Organizational Collaboration: An Analysis Method Based on Knowledge Flow
Yuan Xinwei , Wu Meng . Knowledge Gap and the Balance between Explicit and Tacit Knowledge in Cross-Organizational Collaboration: An Analysis Method Based on Knowledge Flow[J]. Knowledge Management Forum, 2013 , 2013(10) : 1 -7 . DOI: 10.7536/j.issn.2095-5472.2013.10.001
图2 跨组织显、隐知识流对比矩阵 |
| 1 … | i | … I | 1 … | j | … J | |
| 1 | ||||||
| ┆ i ┆ I | E/T | |||||
| 1 ┆ j ┆ J | ||||||
| E/T | ||||||
(1)
代表任一个体n的显性知识流缺口,计算方式如式(2)所示:
(2)
表示结点n的外向显性知识流数,
表示结点n的外向隐性知识流数,
表示结点n的内向显性知识流数,
表示结点n的内向隐性知识流数。
(3)
代表任一个体n的隐性知识流缺口,计算方式如式(4)所示:
(4)
、
、
和
的含义同前。
、外向隐性知识流数
、内向显性知识流数
、内向隐性知识流数
。在此基础上依据式(1)-(4),即可得出群体显性知识流缺口D -E和隐性知识流缺口D -T ,通过分析D -E和D -T,可以从参与协作的群体层面了解相应的显、隐知识流平衡状况。图3 H、X两个企业间跨组织显、隐知识流对比矩阵 |
| H1 | H2 | H3 | H4 | X1 | X2 | X3 | X4 | X5 | X6 | X7 | X8 | |
| H1 | E/T | E/T | E | E | E | E/T | E | E/T | ||||
| H2 | E/T | E/T | ||||||||||
| H3 | T | E/T | E/T | |||||||||
| H4 | T | E/T | ||||||||||
| X1 | E/T | E | E/T | E | ||||||||
| X2 | T | |||||||||||
| X3 | E/T | |||||||||||
| X4 | E/T | |||||||||||
| X5 | E/T | |||||||||||
| X6 | E/T | |||||||||||
| X7 | E/T | |||||||||||
| X8 | T | E/T |
图4 H、X两个企业跨组织协作中的个体隐性知识缺口 |
| H1 | H2 | H3 | H4 | X1 | X2 | X3 | X4 | X5 | X6 | X7 | X8 | |
| H1 | × | × | × | × | ||||||||
| H2 | ||||||||||||
| H3 | ||||||||||||
| H4 | ||||||||||||
| X1 | × | × | ||||||||||
| X2 | ||||||||||||
| X3 | ||||||||||||
| X4 | ||||||||||||
| X5 | ||||||||||||
| X6 | ||||||||||||
| X7 | ||||||||||||
| X8 |
、外向隐性知识流数
、内向显性知识流数
、内向隐性知识流数
。在此基础上依据式(1)-(4),得出群体显性知识缺口D -E为0.75,代表两企业协作人员间人均的显性知识流缺失数为0.75条。隐性知识缺口D -T为0.92,代表两企业协作人员间人均的隐性知识流缺失数为0.92条。分析结果如表1所示:表1 H、X企业跨组织显、隐知识缺口 |
| 个体编号 | 个体外向显性知识流数 | 个体外向隐性知识流数 | 个体内向显性知识流数 | 个体内向隐性知识流数 | 个体显性知识 缺口 | 个体隐性知识 缺口 | 群体显性知识 缺口 D -E | 群体隐性知识 缺口 D -T |
| H1 | 8 | 4 | 2 | 3 | 1 | 4 | 0.75 | 0.92 |
| H2 | 2 | 2 | 3 | 2 | 0 | 1 | ||
| H3 | 2 | 3 | 3 | 3 | 1 | 0 | ||
| H4 | 1 | 2 | 2 | 3 | 2 | 0 | ||
| X1 | 4 | 2 | 1 | 2 | 1 | 2 | ||
| X2 | 0 | 1 | 1 | 2 | 2 | 0 | ||
| X3 | 1 | 1 | 2 | 1 | 0 | 1 | ||
| X4 | 1 | 1 | 2 | 1 | 0 | 1 | ||
| X5 | 1 | 1 | 2 | 1 | 0 | 1 | ||
| X6 | 1 | 2 | 1 | 1 | 1 | 0 | ||
| X7 | 1 | 1 | 2 | 1 | 0 | 1 | ||
| X8 | 1 | 2 | 2 | 2 | 1 | 0 |
| [1] |
Liu Min-Shi, Liu Nien-Chi. Sources of knowledge acquisition and patterns of knowledge-sharing behaviors: An empirical study of Taiwanese high-tech firms[J]. International Journal of Information Management, 2008,28(5): 423-432.
|
| [2] |
Blackler F. Knowledge, knowledge work and organizations: An overview and interpretation. Organization Studies,1995, 16(6): 1021-1046.
|
| [3] |
Carlsson S A. Knowledge managing and knowledge management systems in inter-organizational networks[J]. Knowledge and Process Management, 2003, 10(3): 194-206.
|
| [4] |
Chebbi I, Dustdar S, Tata S. The view-based approach to dynamic inter-organizational workflow cooperation[J]. Data & Knowledge Engineering, 2006, 56(2): 139-173.
|
| [5] |
McAfee A P. Enterprise 2.0: The dawn of emergent collaboration[J]. MIT Sloan Management Review, 2006, 47(3): 21-28.
|
| [6] |
Yang J H, Chen Y L. A social network-based system for supporting interactive collaboration in knowledge sharing over peer-to-peer network[J]. International Journal of Human-Computer Studies, 2008, 66(1): 36-50.
|
| [7] |
Nonaka I, Takeuchi H. The knowledge creating company: How Japanese companies create the dynamics of innovation[M]. New York: Oxford University Press, 1995.
|
| [8] |
Mcbriar I, Smith C, Bain G, et al. Risk, gap and strength: Key concepts in knowledge management[J]. Knowledge-Based Systems, 2003, 16(1): 29-36.
|
| [9] |
樊治平, 王建宇, 陈媛. 一种基于知识缺口分析的知识流程再造方法[J]. 科研管理, 2005, 26(5): 96-101.
|
| [10] |
党兴华, 任斌全. 网络环境下企业技术创新中的知识缺口及其弥补策略研究[J]. 科研管理, 2005, 26(3): 12-16.
|
| [11] |
韩赟, 高长元. 高技术企业知识缺口弥补流程研究[J]. 科学学研究, 2009, 27(9): 1370-1375.
|
| [12] |
Haider S, Mariotti F. Filling knowledge gaps: Knowledge sharing across inter-firm boundaries and occupational communities[J]. International Journal of Knowledge Management Studies, 2010, 4(1): 1-17.
|
| [13] |
Andersen P H. Organizing international technological collaboration in subcontractor relationships: An investigation of the knowledge-stickiness problem[J]. Research Policy, 1999, 28(6): 625-642.
|
/
| 〈 |
|
〉 |